Site logistics and installation phasing are the heartbeat of any construction site. Scheduling and sequence analysis helps to optimize these time-based activities by streamlining the phasing and identifying potential conflicts in the timeline.

BIM One has choreographed the sequencing on a number of logistically complicated projects.

We begin by establishing the sequencing objectives and developing the sequencing model. We then apply a range of analysis and representation techniques so that we can visualize the sequence and tease out any scheduling issues. Working with the project team, we iterate through timeline variations in order to produce a sequencing model that ensures the smoothest possible construction sequence.