University of Montreal, MIL Campus: Science Complex

This project is part of a project to establish a new campus of the Université de Montréal campus on the Outremont site. It will accommodate up to 3500 people as well as six departments and two research centers. Due to previous contamination the site required a significant decontamination phase. An overpass will be built over a very active railroad in the surrounding area to connect the site with the northern part of the city. The project hoping to achieve a LEED certification.

The project will follow the traditional design-bid-build mode. Since the operator and property manager is also the project client, the emphasis is on compliance with the architectural program and its technical requirements.

  • Location Montréal, QC, Canada
  • Budget $345,000,000.00
  • Duration 2016 – 2018
  • Production Conception-soumission-construction
  • Firmes : MSDL, Lemay, NFOE Architectes, SDK, BPA, PMA, SNC-Lavalin, Decasult, EBC
  • Our client Université de Montréal
  • Our role BIM direction

PROJECT PHASES

  • Phase 1

    • Science complex
    • Overpass
  • Phase 2

    • Innovation Center
    • Residential quarters

BIM USES REQUIRED

  • Planification

    • Programming (PFT)
  • Conception

    • Programming validation
    • 3d Coordination & clash detection
    • 3D design review
    • Engineering review / analysis
    • Quantification and estimating
  • Construction

    • 3d Coordination & clash detection
  • Operation

    • Statement to Ministry (SILU)
    • Preventive Maintenance (Maximo)

OUR ROLE AND RESPONSIBILITY

  • Refresh the BIM management plan and develop the BIM execution plan in collaboration with the project team.
  • Ensuring compliance with the procedures and standards detailed in the BIM Management Plan and BIM execution plan.
  • Coordinate and manage meetings with BIM managers of individual disciplines.
  • Answering questions from all project stakeholders related to BIM.
  • Coordinate with the project team to ensure the delivery of BIM models in a timely manner and that the final models are complete and validated.
  • Ensure the needs of the owner for the exchange of data and files in property management and equipment management are respected.
  • Produce discrepancy reports between the models and the architectural program fact sheets at each stage of the project.
  • Track the exchange and progress of the models.